KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  5-21-2010
Number of Hours:  120.00
Manual Reference:  
Brief Description:  Installed the baffles

Installed the Van's baffle kit as per instructions.
' style=

Preparing the parts

Preparing the parts

' style=

Horizontal induction air filter

Horizontal induction air filter

' style=

Painted and installed

Painted and installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.