KitLog pro

Powered By Kitlog Pro v2.0

Russ Karnap
' style=
Date:  7-20-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Prepped and Primed

Forgot to take pics.

Added 3/4" conduit hole in all Right Main Wing Ribs per Vans SB.

Used scotchbrite to roughen surfaces and then Acetone to clean everything. It took a 2.5 batches of Akzo primer to get it all done (Ribs, Fork, Plates, Rear Spar, Tie Down, Spacers, etc....)

It all turned out good.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.