KitLog pro

Powered By Kitlog Pro v2.0

Russ Karnap
' style=
Date:  1-1-2018
Number of Hours:  7.00
Manual Reference:  6: Empennage
Brief Description:  Prep and Primed HS Skins

Prepped and primed both Horizontal Stabilizer skins AFTER dimpling. Used SEM62243 Gray EZ Coat ("Direct to Metal") on the inside of each skin.

All the ribs and spars that were primed before dimpling, need to be touched up. Every dimple lost it's paint during dimpling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.