KitLog pro

Powered By Kitlog Pro v2.0

Russ Karnap
' style=
Date:  12-28-2017
Number of Hours:  6.00
Manual Reference:  6: Drilling HS
Brief Description:  Finished drilling HS.

Finished "Drilling the Horizontal Stabilizer." Disassembled parts in preparation of debur, edge cleaning, and priming.

Made one oops drill "dimple" in one rib (HS00005 - Right Aft Flange Aft Side), but not through material. Clamp slipped during drilling. Took pictures for documentation. See attachments. Everything else went smoothly.
' style=

Right HS HS00006 Closeup

Right HS HS00006 Closeup

' style=

Right HS ready for Debur, Edging, Priming

Right HS ready for Debur, Edging, Priming

' style=

HS0005 - Right Aft Flange - oops

HS0005 - Right Aft Flange - oops

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.