Installed the left side fasteners where the top and bottom cowling halves meet. Marked the rivet spacing on the outside of the cowling, drilled the holes in the cowling, clamped the pre-fabbed flanges in place, and matched drilled them. Installation went easily and all of the fasteners installed good. Only a slight gap was left at the very front but this can be filled easily.