Installed the fuel fittings in the fuel pump. Hung the engine on the plane! A non-event. The engine was hung in approx. 30 minutes. Fabricated and installed brackets to hold the fifth point of the seat belts from 1/8 inch aluminum. Installed the final two bolts in the spar that also secure the control stick assembly and the front 5th point attach