KitLog pro

Powered By Kitlog Pro v2.0

RICH'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-10-2018
Number of Hours:  2.00
Manual Reference:  6-4
Brief Description:  Started VS

Tonight I started the vertical stabilizer.

i Clecoed the VS-808PP spar doubler AND VS-803PP spar together and then clecoed on all of the hinge brackets. I tehn back-drilled the 410 brackets to the spar and doubler.

Thats all for this week, time to go have a granddaugter!
' style=

Preparing to back-drill VS-410PP brackets

Preparing to back-drill VS-410PP brackets

' style=

Back-drilling complete

Back-drilling complete

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.