KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  4-18-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Prepping and first coat fuselage

Installed the aft turtle deck aluminum angle on the upper fuselage by riviting three cam lock fasteners through it, then prepped and taped the fuselage for the first coat of white. Took a while to tape everything. I then used the Scotch Brite pads to scuff and smoothe the metal areas and then cleaned with a sponge. Then used the compressor to blow off then a tack rag to pick up any left over lint. First coat went on well, but runs showed up after a little while. Smoothed with a sponge brush.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.