KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  4-10-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Right Side and Top

Covered the right side and then flipped the fuselage right side up and covered the top. Heat smoothed everything at 250 degrees. The transition from the top of the fuselage to the rudder was difficult and I had to take off the first attempt and start again. Luckily there is a lot of fabric left over. I got it pretty smooth, but it needs an extra tape to smooth it out the rest of the way.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.