KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  3-20-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Heat smoothing tail

Spent most of the day heat smoothing the elevator, rudder and the horizontal stabilizer using the small hobby iron. Takes a lot of time and pressure with 225 degrees of heat. After I was finished I moved my rolling table saw and miter table out to the house garage and cleaned up the mess on the floor after all the cutting and stitching. Came back out later and cut out the fairings for the gas caps from the balsa wood Amanda gave me. Sanded them smooth and will decide when to put them on later. Painting is getting close. Need to get the paint tomorrow.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.