Powered By Kitlog Pro v2.0
ROBERT'S WEB SITE
Series 7 Super Sport
Covering
3-4-2018
< Previous Log Entry
Next Log Entry >
Date:
3-4-2018
Number of Hours:
3.00
Manual Reference:
Brief Description:
Second Coat of Polybrush
Put the second coat of polybrush on the right wing. Heat formed and trimmed the wingtip and root, then installed the wingtip mounts with rivets. Marked the stitching lines with chalk line and marked the tape edges on some of the ribs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Series 7 Super Sport Home
Category
# Logs
# Hours
All
214
1003
Avionics
5
18
Covering
29
132
Empennage
8
34
Fuselage
125
568
Painting
13
55
Wings
34
196
Copyright © 2001-2024 Matronics. All Rights Reserved.