KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  7-30-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Finished cowling

Sanded the Superfil I put on the oil level access door. Turned out pretty good. Finished installing the camlocs in the fire wall and the where the top and bottom of the cowling meets. Took a while to get them all done. The cowling mates up pretty well now, and the spacing for the prop is good. Marked and then drilled and clecoed the NACA vents in the boot cowl. Hysoled them in place and will be cut and smoothed next time. That pretty much does it for the cowlings. I need to get the windshield installed so I can do the final fitting and cutting and then paint the cowlings and the flaperons.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.