Installed most of the switches in the instrument panel and printed out labels and attached them. Turned out pretty good. Installed the Dynon display, intercom, and radio. Mounted the panel to the airframe with rubber grommets to damp out vibrations. Sanded the cowling again. Pretty much done, but there was an area that I gave some more Superfil to. Should finish the cowling and allow me to install the camlocs.