KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  6-12-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wiring

WIred the connector from the Rotax Fuse Box to the aircraft switches and power supply fitting and cripming the connectors before assembly. Drilled the mounting holes for the EFIS. Mounted the Dynon shunt.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.