KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  5-22-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Water and Oil Hoses

Finished the battery mount and bolted it to the firewall. Also installed the starter solenoid and the master solenoid. Installed all the coolant and oil hoses with the t offs to the heater. Put a lot of effort into getting the hoses on the barbs. It wore me out. The oil hoses have insulation around them so the blue tubes have an orange covering on them. The coolant line has some insulation on the left side where it gets close to the exhaust. Connected the electrical and installed the fuel pumps permanently. Started to sort out the connections for the fuel lines. I have a picture of my brake lines on the bottom of the landing gear that I finished yesterday after getting the steel braided line. Firewall forward mostly done. Electrical and avionics to go.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.