Finished the brake lines including the seaplane grommet outlets for the brake lines to the landing gear top. Installed and ran lines to the parking brake too. Drilled and clecoed the boot cowl in place. Lots of fitting and refitting there. Then finished the heater except for the hoses. The picture is from early on. Made the coolant overflow container holder on the firewall.