Rigged the flaperon control horns on both wings after making the jig out of 2x2s. Drille and deburred them through the #1rib and the hinge collar. Will rivet after painting. Prepped an bonded and riveted the flaperon counter balance weights. Drilled the holes in the left rib reinforcement brackets and deburred.