Finished the inside install of the heater with the hoses and clamps. Will wire it later. Installed the fuse box on the top center engine side of the firewall. Ran the wires to it and connected them to get them out of the way. Also ran the wires to where the ECU (Engine Control Unit) will be on the other side of the firewall. Loosely connected the fuel pump unit until I get the fuel hoses connected to it. A lot of things for less than three hours today. Got confirmation on the propeller spacer so I will be able to put the cowling on when I am ready for fiberglass cutting.