KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  4-13-2018
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Finished Tapes

Finally finished the tapes on the fuselage. Also finished all the doilies and reinforcements on the fabric. Heat smoothed everything trying to get all the small drops of glue smoothed down. Sanded and installed the seaplane grommets on the bottom (6). Installed one inspection ring on the back left side for the trim motor. Painted the area that the tailwheel spring will cover so I can put the pipe back on to rotate the fuselage without missing that area while painting. A little more cleaning and then I will be ready to paint.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.