KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  12-27-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Horizontal Stab

Finished hysoling the ribs in the elevator and horizontal stabilizer. Pressed the bearing and bushing in the horizontal stabilizer and attached to the fuselage. Cut and sanded the slider blocks for the horizontal stab and temporarily installed and marked with drill starts. Attached and rigged the horizontal stab struts making true to the vertical stab. Attached the trim motor on the bottom and temporarily on the top connection to the horizontal stab.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.