Reamed and installed the bushings and bearings in the 7 places in the horizontal stabilizer. Took longer than I thought. They each needed a lot of work and lots of time sanding while chucked on a bolt in the drill press. Used loctite to permanently set them while pressing with a pair channel grip pliers, among other things. Lots of work.