Powered By Kitlog Pro v2.0
ROBERT'S WEB SITE
Series 7 Super Sport
All
10-12-2017
< Previous Log Entry
Next Log Entry >
Date:
10-12-2017
Number of Hours:
5.50
Manual Reference:
Brief Description:
Varnishing Ribs
Very long day in a respirator varnishing both wings with two coats of two part epoxy varnish. Second coat extra thick and not pretty, but will protect very well. Sanded the top and bottom of the ribs before varnishing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Series 7 Super Sport Home
Category
# Logs
# Hours
All
214
1003
Avionics
5
18
Covering
29
132
Empennage
8
34
Fuselage
125
568
Painting
13
55
Wings
34
196
Copyright © 2001-2024 Matronics. All Rights Reserved.