Installed sight guage tubing in both wings and finished fitting the aluminum sight gauge backing and drilled the holes for mounting to the #1 rib. Trimmed the bottom false ribs and partial rib #2. Cut spacers for the area between rib #1 and the tanks. Cut trailing edge aluminum channel. Bonded all these things to the wing and the tank after prep.