KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  9-18-2017
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Install tanks, fittings, sight gauge

Cleaned and prepped tank for install. Removed material on #1 rib for fitting clearance.Put sealant on fittings and installed into tank. Bonded tanks to wing spars with supplied sealant. Cut sight gauge aluminum backing plate between 1/2 inch holes and trimmed the top to fit inside rib.Cut leading edge forms for use with Laker Leading Edge fiberglass.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.