Cleaned and prepped tank for install. Removed material on #1 rib for fitting clearance.Put sealant on fittings and installed into tank. Bonded tanks to wing spars with supplied sealant. Cut sight gauge aluminum backing plate between 1/2 inch holes and trimmed the top to fit inside rib.Cut leading edge forms for use with Laker Leading Edge fiberglass.