KitLog pro

Powered By Kitlog Pro v2.0

Robin's RV8 Web Site
' style=
Date:  3-9-2013
Number of Hours:  1.00
Manual Reference:  Electrics
Brief Description:  Electric finishes 1.

Slowly the various electric and avionics are coming together. The Andair fuel pump installation is now complete, the avionics worked though there was a moment of panic until I realised the master switch needed turning on as well as the avionics master switch.
The P-Mags are vulnerable to heat over 200 deg F, a heat sticker has been placed on each one and a blast tube will be fitting as per the suggestion in the installation instructions.
' style=

Andair Fuel Pump

Andair Fuel Pump

' style=

Garmin Screens

Garmin Screens

' style=

P-Mag

P-Mag

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.