KitLog pro

Powered By Kitlog Pro v2.0

Robin's RV8 Web Site
' style=
Date:  10-7-2011
Number of Hours:  1.00
Manual Reference:  DWG 16A
Brief Description:  R.W. Tank inside finished 1.

Note the Fuel Pick Up needed bending around the DS Nutplates. On the other side is a Fuel Flap.

A flop tube was considered but since no serious aerobatics were anticipated this difficulty was left out. There should be 15secs of fuel in the fuel lines in any case. Spitfires managed without them!

The Inner Fuel Capacitor Plate is installed with small cut-outs around the Stiffener Plates to ensure the called for clearance.

The third inner rib was installed with a sealant poorly mixed, it did set finally. For peace of mind as much old sealant was removed as possible and then a fresh seal put on top.
.
' style=

R.W. Tank Inner Bay

R.W. Tank Inner Bay

' style=

R.W.T. Fuel Flap

R.W.T. Fuel Flap

' style=

R.W.T. 2nd Inner Bay

R.W.T. 2nd Inner Bay

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.