KitLog pro

Powered By Kitlog Pro v2.0

Ron's Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-7-2019
Number of Hours:  4.00
Manual Reference:  Section 7
Brief Description:  Prep Right Tank for Closure

Roughed up and cleaned all residue with acetone in prep for sealing. Mixed up a 130 gram batch of proseal and loaded it into a large syringe. Same procedure as with the Left Tank adding a bit more Proseal on the End Rib Aft Flanges (where I found that pinhole leak on the Left Tank). All rivets were driven (160) with Carol's help. She insterted the rivets and I followed with the squeezer... big time saver.
' style=

Tank Prepped for Proseal

Tank Prepped for Proseal

' style=

Marked for Attach Angle Position

Marked for Attach Angle Position

' style=

Right Tank Baffle Installed

Right Tank Baffle Installed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.