Powered By Kitlog Pro v2.0
Ron's Web Site
RV-9A
Empennage
10-29-2018
< Previous Log Entry
Next Log Entry >
Date:
10-29-2018
Number of Hours:
3.00
Manual Reference:
Section 6
Brief Description:
Vertical Stabilizer Riveting
Riveted all of the Vertical Stabilizer except for the skin to Aft Spar. The Forward Face of the Forward Spar must be flat for attachment to Fuselage (Image 1). I need to look into wire routing for the tail position light before closing it up.
Fore side of VS Forward Spar
VS not closed up yet
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
224
764
Empennage
74
234
Fuel Tanks
35
122
Inspection
2
4
Miscellaneous
8
14
None
1
Wings
104
390
Copyright © 2001-2024 Matronics. All Rights Reserved.