KitLog pro

Powered By Kitlog Pro v2.0

Ron's Web Site
' style=
Date:  7-6-2019
Number of Hours:  2.50
Manual Reference:  Section 7
Brief Description:  Fuel Tank Testing

I brought the Left Tank out onto the patio and while pressurized, everything was sprayed with soapy water. I found one tiny pinhole leak where the aft flange of the outboardmost rib contacts the rear baffle. After rinsing off all of the soap, I dried the tank and removed the rivets local to the leak. The Attach Angle was removed and the flange and baffle were slightly separated so that Proseal could be applied between them. I used a small syringe to pump in the ProSeal under pressure. I reinstalled the Attach Angle and the five rivet that were removed.... will have to wait a day or two to retest. Started preparing the Right Tank for final closure.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.