The fuel tanks will be connected to the main spars with screws and platenuts. 31 platenuts had to be riveted to the top and bottom flanges of the main wing spar... that's 31 x 2 x 2 wings = 124 platenuts and each platenut gets two AN 426 rivets which required that the spar flanges be countersunk in those 248 places.