Powered By Kitlog Pro v2.0
Ron's Web Site
RV-9A
All
12-6-2018
< Previous Log Entry
Next Log Entry >
Date:
12-6-2018
Number of Hours:
2.00
Manual Reference:
Section 6
Brief Description:
Left Elevator
Began working on the Left Elevator. Clecos and match-drilling. The instructions say that this side will be more difficult than the Right side. Not yet, but who knows what the trim tab will bring.
Left Elev Clecoed
Clecoed with Counterbalance
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
224
764
Empennage
74
234
Fuel Tanks
35
122
Inspection
2
4
Miscellaneous
8
14
None
1
Wings
104
390
Copyright © 2001-2024 Matronics. All Rights Reserved.