KitLog pro

Powered By Kitlog Pro v2.0

Ronalds Web Site
' style=
Date:  11-1-2018
Number of Hours:  5.00
Manual Reference:  06-03
Brief Description:  Fitting Vert Stab Ribs

Deburred and used a scotch brite pad on the dremel to prepare the surfaces for primer. Test fitting all the pieces together and straightening the ribs.

Drilled the #12 holes in the hinge points of the rudder hinges. This was to resize after the powder coating.
' style=

Rudder hinge

Rudder hinge

' style=




' style=

Rudder substructure

Rudder substructure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.