Powered By Kitlog Pro v2.0
***
Bearhawk
Empennage
10-3-2006
< Previous Log Entry
Next Log Entry >
Date:
10-3-2006
Number of Hours:
2.00
Manual Reference:
Brief Description:
Installed horizontal stab and elevator
Tonight I installed the horizontal stabilizor and elevator. I'll have to pull off one side of the stab and elevator because I forgot to install the elevator trim pivot tube.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
117
527
Covering/painting
5
50
Electrical
3
15
Empennage
11
24
Engine
1
Fuel System
2
17
Fuselage
34
155
Landing gear
8
12
Miscellaneous
4
2
Tools
1
0
Wings
48
252
Copyright © 2001-2024 Matronics. All Rights Reserved.