I worked more on the baffle seals. I also did some more epoxy work on the cowling covering the rivets. While I was waiting for that to set .. i started on hooking up the rudder pedals to the rudder cables. I locked the rudder in position and set the nose wheel straight. Then I found out the attach points on the pedals aren't drilled out to 1/4 inch. So .. have to try to do that in the plane. Would take a long time to remove the pedals .. especially with the brake system installed on them. Going to at least have to remove the brake pedal on the left rudder pedal. Should have done that before installing them .. but there weren't any notes anywhere saying to updrill them for AN4 bolts. Oh well .. another side track.