KitLog pro

Powered By Kitlog Pro v2.0

Rogers Sonex Site
' style=
Date:  1-24-2013
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Misc - Interior, cowling

First off I finished my storage compartment behind the seat. I used some channel and made protective supports around the elevator push rod as a safety measure. The floor of the compartment is just held down with velcro so it can be lifted up to see the union in the push rode.
Next I added a 22,000 mf electrolytic capacitor to the charging circuit to try to head off any noise in that line.
I then started working on the cowlings. I cut the two cylinder head cooling holes and the slot at the back for the exhaust. A Dremel with a small cutoff wheel made that pretty easy.
I think the cowling is going to be one of those time consuming things that you just have to go real slow if you want it to turn out well.
' style=

Channel support to protect elevator rod

Channel support to protect elevator rod

' style=

Finished storage compartment

Finished storage compartment

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.