I worked on some misc bundling and tying wiring. I then finished the flush rivets inside the tunnel. I didn't have enough rivets so one of the guys from the yahoo group dropped some by and got me going again. Thanks Kirk. Then I did some fitting of the phenolic blocks and installed the flap drive tube. Next I made the flap handle, which I hadn't done yet. I'll go over everything tomorrow first, but I think I'm ready to permanently install the wings. Progress.