KitLog pro

Powered By Kitlog Pro v2.0

Rods RV-6 Website
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-17-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Initial Prop Installation

Wired heater, installed prop, set blade pitch to 14 degrees and performed first engine run with prop installed.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.