KitLog pro

Powered By Kitlog Pro v2.0

Rods RV-6 Website
' style=
Date:  5-28-2009
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Bearing Repack, Airport Move Prep

Repacked the main wheel bearings. Began disassembly of aircraft in preperation for the move to the airport.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.