So in the last few weeks I have removed and deburred all the ribs and riveted them in place. Also the flap and aileron pocket ribs.
I have constructed the false spars and installed the nut plates for fuel tank strap anchors. False spars riveted in this morning. I then installed and riveted in the .040 aluminium support piece for the inboard flap support frames.
Drilled out the corresponding rivets on the main spars for the tank straps.
The pulley cable retainers are built and installed.
I now need to torque all the hardware, safety-wire some and install conduit for wiring.