Finished installing the hardware portion into the floor rib area. Torqued all bolts on the prop hub again to spec and marked. Torqued the prop collars to spec, installed the locking rings, torqued and marked all. Time spent planning wiring system. Still some changes to be made. Bill Speers is an invaluable source of electrical knowledge. The system should have a double circuit plus another bypass system. Lots of redundancy. Accidentally erased todays photos.