Identified the wires in the elevator servo harness, attached, shrink tubes and tested. Then installed and setup the pushrod. Moved on to the left wingtip. Identified, labelled, and installed connectors in both the wingtip and wing harness. Testing will be another day. Good strong gas-tight connections.