KitLog pro

Powered By Kitlog Pro v2.0

Randalls Web Site
' style=
Date:  3-10-2009
Number of Hours:  7.10
Manual Reference:  
Brief Description:  More cowling work

Mixed a batch of epoxy resin with glass beads and did the initial coolant intake openings. Finished the oil cooler. Turned out very nice. Riveted the lower cowl exit vents. Laid out the lower cowl for the opening to be cut for the oil cooler vent.
' style=

Finished oil cooler vent.

Finished oil cooler vent.

' style=

Epoxy & glass bead slurry.

Epoxy & glass bead slurry.

' style=

1 of 2 Lower cowl exit vents.

1 of 2 Lower cowl exit vents.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.