KitLog pro

Powered By Kitlog Pro v2.0

Randalls Web Site
' style=
Date:  3-6-2009
Number of Hours:  2.70
Manual Reference:  
Brief Description:  New Oil vent

This is the core wrapped in wax paper before doing any fibreglass layups. This time I am only going to do the top and both sides first. The bottom can be done AFTER the 3 surfaces set up. The last time I did all 4 surfaces, hung on a pole, and the bottom sagged with gravity. Ruined the part. Like Bullwinkle say to Rocky..."this time for sure".
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.