KitLog pro

Powered By Kitlog Pro v2.0

Randalls Web Site
' style=
Date:  11-17-2008
Number of Hours:  5.20
Manual Reference:  
Brief Description:  Bottom wing skin

Well, the heated pitot is ready to fasten in, the mast is ready, the wiring is in and all was tested. Now...on with the last wing skin. Some of the rivets were absolutely horrible to get at, but I only had the use 2 c/s pulled rivets. No ching marks and every rivet checked with guage because they were almost impossible to view. Another successful day. Next is finishing the return line to the fuel tank. Then on to the next wing.
' style=

Safeair line kit with quick-connects.

Safeair line kit with quick-connects.

' style=

Wired, plumbed and tested.

Wired, plumbed and tested.

' style=

One piece right to the guages. I will leave a loop in case I ever have to remove the wings.

One piece right to the guages. I will leave a loop in case I ever have to remove the wings.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.