Powered By Kitlog Pro v2.0
Randalls Web Site
RV9A
Engine
3-30-2009
< Previous Log Entry
Next Log Entry >
Date:
3-30-2009
Number of Hours:
3.30
Manual Reference:
Brief Description:
Engine removal.
Barry and I removed the engine so the plane could be flipped on it's back for easy paint stripping and repainting. Also removed nose gear to send in for rework.
On stands ready for reinstallation.
Has to be shortened and rethreaded.
Ready to replace old yoke.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
584
2423
Assembly
17
84
Avionics
11
41
Calibration
2
6
Calibration and adju
2
8
Canopy
34
164
Cowling
49
171
Empennage
57
216
Engine
48
175
Finishing for first
30
80
Flight Testing
7
16
Fuselage
46
238
Instrument Panel
29
124
Landing gear
9
30
Miscellaneous
28
210
None
4
0
Paint
58
227
Prop
4
11
Redrive Swap
5
15
Taxi Testing
5
17
Testing
8
31
Tools
1
3
Transporting to hang
6
13
Wheel Fairings
12
52
Wings
54
250
Wiring
58
241
Copyright © 2001-2024 Matronics. All Rights Reserved.