Finalized the brake tubing with the install of the parking brake valve and the tubing between the valve and the master cylinders with nylaflow tubing. I will probably replace the nylaflow tubing by speedflex later.
Also I did the lettering on the instrument panel. I only have the marking of a few instruments to do.
Keep doing little things before moving the aircraft to the hangar. Today, I received all the documents for the final inspection and more. A lot of paper work to do.