KitLog pro

Powered By Kitlog Pro v2.0

Roberts Web Site
' style=
Date:  3-20-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  left flap completed

I worked 6 hours over the last 3 days to complete the left flap. The top side is still on cleco for the inspection. After the rear and front skin has been drilled and clecoed, I clamped the flap in place to drill the hole on the hinges. Then I riveted the bottom side. Install oilite bushing in the holes.
' style=

flap clamped in place

flap clamped in place

' style=

bottom side riveted

bottom side riveted

' style=

oilite bushing

oilite bushing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.