Spent 4 hours over the last few days to attach the fuselage to the cabin. Drilled twomrows of holes on the cabin lower skin in the 40mm that exceed in the back. Also mount the float attachement and cable pulleys. Drilled and riveted the 414 rivets on both sides of the cabin. Positionned and began to drill the right cabin to fuselage skin.