Very productive day today. Positionned, drilled and clecoed the firewall (only on the upper angle piece) I'm still waiting for the lower angle piece from Bushcaddy. Install the glare shield to see if the 2 holes are OK for the diagonal braces.....they are.
Install PF-190 & 191 and all 5 pieces PF-183. Still doesn't know how to positionned PF-193 & 195 correctly. If I go with the dimension on the plan ( 180mm) it doesn't seem to give a smooth line. I'll try to figure it out tomorrow.