Powered By Kitlog Pro v2.0
Roberts Savannah VGW Web Site
SAVANNAH VG Wide-Body
All
3-14-2009
< Previous Log Entry
Next Log Entry >
Date:
3-14-2009
Number of Hours:
4.00
Manual Reference:
Ch 9
Brief Description:
Elevator
Finishing up the elevator. Installation of the control horns. It is important to insure youve lft the correct holes open in previous steps so that this can be installed.
Hard to see, but theer are open holes on the longerons and skin
From the rear
From the front. Very solid when completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SAVANNAH VG Wide-Body Home
Category
# Logs
# Hours
All
58
410
Avionics
1
2
Control system
1
2
Empennage
20
59
Engine
4
42
Fuselage
20
266
Initial Kit Acquisit
7
29
Landing Gear
2
9
Miscellaneous
2
Wings
1
1
Copyright © 2001-2024 Matronics. All Rights Reserved.